Skip to content

Insights

Pre-training, fine-tuning or retrieval: what do we actually need?

Decide for retrieval over the documents you already keep, and leave fine-tuning and pre-training until a trial shows the documents are not the problem.

5 min readDynacore

Cite this briefing as https://dynacore.com.au/insights/pre-training-fine-tuning-or-retrieval-what-do-we-actually-need

Picture a Thursday morning in a small services business. A customer asks whether last year's specification still applies, and what the same work would cost now. The person who would know is out on a job. The quote is an email, a PDF, or a scan in a folder named for the street, and someone answers from memory. The owner has been told to train a model.

Start with retrieval over the documents you already keep. A hosted model drafts from the passages it finds, and the draft names the file. That pattern is often called retrieval-augmented generation, or RAG. Fine-tuning is a later test, for a repeated judgement a better document does not fix. Pre-training a model from scratch is almost never what a small business needs. This is part 3 of From One Workflow to a Factory. Part 1 is when an agent should decide. Part 2 is the platform around a workflow.

What the time costs, and what a new model costs

Suppose one person spends half an hour on each of five days a week finding a past quote or a procedure. That is an illustration, not a survey result, and it comes to 2.5 hours. From 1 July 2026 the national minimum wage (opens in a new tab) is $26.44 an hour for an adult employee in the national system who is not covered by an award or agreement. At that rate, 2.5 hours is $66.10, and 52 such weeks is 130 hours, or $3,437.20. It is an estimate, not a measured average or a software price. Count two ordinary weeks of your own minutes, and use $26.44 only as the floor.

Training from scratch is a different order of cost. The 2025 AI Index (opens in a new tab), using Epoch AI estimates based on cloud rental prices, puts GPT-4 at around US$79 million and Llama 3.1 405B at US$170 million. These are US dollar estimates, not invoices, and they are not comparable with the wage above. Epoch AI's cost model (opens in a new tab) found that a cloud rental price for the final run is around twice the hardware and energy cost, on average, and leaves out staff and earlier experiments.

Three sizes of answer

Small. One trusted folder, such as past quotes or job procedures, searched by a hosted model. The draft names the file. A person checks every answer before it is used. Nothing can change the accounts, the customer record or the price list.

Medium. The same retrieval, on one workflow. Write which folders are in, who may ask, and where the documents, the embeddings and the prompts are stored. Keep that processing in Australia, and read a sample of answers each week. Do not fine-tune yet.

Large. Fine-tune, or host the model yourself, only when a trial shows a general model misses your wording or a repeated case and a clearer document would not fix it. Further training does not point back to the file, so an old price can linger. Hosting decides where the model and the index run. It does not build a model. Keep the documents as the source, and keep part 2's controls: an owner, a limit, a log, and a path that works with the tool off.

Why pre-training is almost never the job

Pre-training builds a new model on a vast set of text so it learns language before it has seen your business. Your quotes are not that set. A hosted model already has the general ability, the frontier cost above is the wrong scale, and a trained model goes stale when a specification changes. A smaller run still needs data, hardware, a way to tell a good model from a bad one, and people to run it. Retrieval reads the current file.

Risks, and where the documents sit

An answer that reads well can still be wrong if the passage is old or from the wrong job. Keep a person on it until you have read real questions, including awkward ones. Sending, pricing or promising without that person is the decision in part 1.

An embedding is a list of numbers made from a passage so similar passages can be found. The prompt carries the question and the passages. Stored or processed overseas, that material has left the office even when the file has not. Ask the provider in writing what is stored, for how long, whether your content is used to train a model, and in which country. A vague answer means you do not connect the folder.

Keep processing in Australia: a hosted service that does so, a private cloud, or equipment on your premises. Index only folders the people who ask may already read. Leave out wages, health details and the full customer list.

Where the Privacy Act 1988 applies, overseas disclosure is covered by the Australian Privacy Principles (opens in a new tab), including cross-border disclosure (opens in a new tab). Most businesses with annual turnover of $3 million or less are not covered (opens in a new tab), the Office of the Australian Information Commissioner explains. Exceptions include health service providers and some businesses that trade in personal information. This briefing is not legal advice.

The file stays the record. The Australian Taxation Office requires most records to be kept for five years (opens in a new tab), generally from the later of preparing or obtaining the record and completing the transaction. Some records are kept longer, and the information must not be changed. If the draft and the file disagree, the file wins.

One next step

Pick the folder from Thursday. Write what may go in, what must stay out, and who may ask. For two weeks, note the real questions and whether the current file would have answered them. Do not upload it until the provider's written answers are in hand. Build retrieval first.

The small business page is the engagement that starts with one workflow. This briefing is general information. It is not a proposal, and it does not set a price. If you want to talk through that one folder, get in touch through the contact page.

Published by Dynacore. Dynacore is operated by Natro Technic Pty Ltd, ABN 57 156 275 320, ACN 156 275 320. This briefing is general information, and it is not a proposal or formal advice.