From the first brief to operations
Commissioning is the proof that the system you agreed is the system that is running: power, thermals, fabric, storage, failure behaviour and a written handover.
01
Assess
Workload, data, site, and the constraints that bound the design.
02
Design
Reference architecture, capacity, fabric, storage, and facility interfaces.
03
Build
Compute, network, storage, power and cooling, integrated as one system.
04
Integrate
Identity, enterprise systems, models and agents, and the paths data may take.
05
Operate
Commissioning, acceptance, observability, handover, and the run model.