Supporting practice
The workplace and cloud the AI systems inherit.
Identity, devices, cloud platforms and the network between them decide whether an AI program can be administered. Dynacore still does this work, in service of the practices above it.
The lead offer is the AI Factory, Agentic AI, and AI integration and automation. This page is the foundation those practices stand on. It replaces a set of older service pages with one account of the work.
Cloud platforms
Architecture and migration on the major public clouds and on private infrastructure. The choice follows residency, latency, the operational team you have, and the cost you can explain. We design the landing zone, the network path and the operating guardrails. We publish service levels only when they are written into an engagement.
Microsoft workplace
Microsoft 365 is the workplace many Australian organisations already run. We design tenant structure, identity, device management and collaboration so AI tools sit inside a workplace you administer, with conditional access and a join process your security team recognises.
Identity and security foundations
AI systems inherit the identity around them. We design directory structure, privileged access, device posture and logging foundations as part of the platform. This is architecture and implementation support. A security operations centre is a separate decision, and we do not imply one by describing the design.
Connectivity and calling
Wide area networks, secure access and calling platforms, including Microsoft Teams, where they are part of the workplace the AI systems depend on. The design follows the sites and the identity model you already have.
How it connects
An agent that writes into a business system needs an identity. A private model needs a network path and a place to run. A workplace rollout of AI tools needs device and data controls that already exist. We design those controls with the AI work, so the foundation and the factory are one program when they need to be.
Answers
Direct answers
Short statements for the questions this page is here to settle.
How does cloud and workplace work relate to the AI practices?
Cloud platforms, Microsoft workplace, identity and connectivity are the supporting foundation. The lead practices are AI Factory, Agentic AI, and AI integration and automation. The foundation is designed so those systems can be administered.
Brief us on the foundation
If the question is the tenant, the landing zone, or the identity the AI work will use, start here.